- Operator
- Meta
- Locality label
- Sumner County
- Source-attributed status
- Serving traffic since November 2024
- Investment
- More than $1.5B at full build-out — operator
- Power
- Not disclosed (530 MW renewable procurement is separate)
- Employment
- Over 100 operational jobs — operator, 2024
Meta's 2020 post put the investment at more than $800 million supporting about 100 jobs; its 2024 post says the fully built facility will represent more than $1.5 billion in Tennessee.
Meta says eight Meta-supported projects with TVA add 530 MW of new renewable energy in Tennessee; that is a renewable-supply figure, not the campus load.